Contractors World

The online digital publication for construction, demolition, mining and quarrying industries.

November-December 2009
 

Buyers Guide
Adjust type size
decrease font size increase font size
previous page   PAGE 28   next page
HOME PAGE 

October 2009 ISSUE  - Contractors World, the digital publication for construction, mining, quarrying and demolition industries
October 2009

SEPTEMBER 2009 ISSUE  - Contractors World, the digital publication for construction, mining, quarrying and demolition industries
Sept 2009


CP&E
Contractors Plant & Equipment

NOVEMBER 2009 ISSUE  - CP&E - Contractors Plant & Equipment -  the digital publication for construction, mining, quarrying and demolition industries
Nov 2009

 

GERMANY - Long-reach Boom Pumps and Bulk Material Conveyors - cont


Telebelt Delivers Materials

With a large part of the concrete placement now done, a TB 130 mobile conveyor belt system is being used. This conveys unpumpable, pourable bulk materials into the site of concrete placement via a telescoping conveyor belt.
With a large part of the concrete placement now done, a TB 130 mobile conveyor belt system is being used.

Typical materials include excavated material, hardcore, sand, humus, bark mulch and granulated or extremely stiff, earth-moist concretes.

The Telebelt - before installation of the final layer and the construction concrete – had conveyed dry filling and tamped concrete (consistence class F1) as well as sand and hardcore into the various pits.

The building materials were initially passed onto the Telebelt feed conveyor either by truck mixers, truck tippers, mobile excavators or wheel loaders.

The material was then transported up to 39 m along the main telescoping conveyor belt and distributed with the required precision.

The belt movements and the delivery rate are controlled by radio remote control, similar to the control of the PM truck-mounted concrete pumps. Even an inclined raising or lowering of the delivery belt is possible. The actual installation performance of the TB 130 depends on the type of bulk material, the construction site logistics, the waiting times between the batches, etc. The Telebelt is designed for an output of up to 270 m³/h (max./theor.).

New High efficiency Coal Power Plant

The two new power plant blocks of RWE Power AG will be fired with coal and petrol coke. With an efficiency of approximately. 46%, the new two-block plant will be one of the most modern and efficient coal power plants in the world. Blocks “D” and “E” should be connected to the grid by the start of 2012, and blocks “A” and “B” which have been in service since 1962/63 (output per 160 Megawatt) will be shut down.

more information Contact Details

Putzmeister
Company Web Site:         

 


 
 

previous page   PAGE 28   next page
 
red divide
CW Contractors World - the digital publication for construction industry   cmldir.com
Online Buyers Guide of Construction, Quarrying & Mining Suppliers.

 

Published by VVV Limited
Content compiled and edited by:
Roger Lindley MCIM

©VVV Ltd 2009 All Rights Reserved

 

Contractors World - Eco Friendly publishingBy reading this page on line you are helping to save trees.

Trees saved up to December 1, 2009: 2+

 

CONTRACTORS WORLD
CML House
7 Bell Mead
Sawbridgeworth
Herts CM21 9ES
UK
Tel: +44 1279 600598
Email: info@contractorsworld.info
URL: http://www.contractorsworld.info

To advertise in Contractors World see details at   http://www.contractorsworld.info/support/advertising-uk.php

Contractors World, CP&E - Contractors Plant & Equipment and the CW Supplements are independent publications published through CWMags. The mention of companies and/or products within the editorial pages or in advertisements does not infer any endorsement by the publisher or editors. All editorial is freely given, without conditions and at the sole discretion of the editor. Opinions expressed by contributors are not necessarily those of the publishers.

Copying, reproduction, decoding or disassembly of content or computer code by any means of any part of the publication is prohibited unless prior approval is provided by VVV Ltd in writing and confirmation received of agreement with any terms and conditions applicable. PDF version may be downloaded for personal use but no content may be used for promotional purposes or copied to web sites.